construction Unit:Construction Fifth Engineering Bureau
Purchase Mold:column template
Project Address:On the Development Axis of Tai\'an Era
This project requires nearly 1000 cylinders with diameters of 400mm, 700mm, 800mm, 900mm, 1200mm, and heights ranging from 3-6 meters. Use our company's wooden circular formwork for integrated pouring construction, with a construction period of 5 days. The procurement cost of wooden round formwork is about 700000 yuan, and it does not require the use of a crane. Manual installation of the formwork can be completed.
Taking the Tai'an Culture and Art Center project as an example, for the same amount of work, if steel circular formwork is used for construction, a crane installation construction period of at least 15 days is required, and the procurement cost alone reaches 1.6 million yuan (this price has already deducted the value of waste formwork recycling). Especially with the additional 10 day construction period, there are many costs for the construction party, such as equipment rental and office staff expenses, which are estimated to be between 600000 and 1000000 yuan. In this way, using our company's wooden circular formwork can save more than 1.9 million yuan in costs and greatly shorten the construction period.
If PVC round formwork and strip formwork are used, the price will be higher, and the construction period cannot be guaranteed.
This project uses our company's various specifications of cylindrical wooden templates, which are highly favored by customers in terms of both cylindrical molding and construction speed!