Welcome to purchase our company's cylindrical wood formwork!
Current Location : Home > Project > SM Tianjin Binhai City Plaza

SM Tianjin Binhai City Plaza

construction Unit:China State Construction Engineering Corporation

Purchase Mold:Building circular formwork

Project Address:Within the Tianjin Airport Economic Zone

The construction area is 560000 square meters, with a project investment of nearly 3 billion yuan. The project adopts our company's cylindrical formwork integrated pouring construction, and does not require the use of mechanical assistance such as tower cranes. The manual installation of the formwork can be completed, greatly shortening the construction period.

Phone/WeChat +86 150 9292 9372

Project Introduction

SM Tianjin Binhai City Plaza is located within the Tianjin Airport Economic Zone, with a construction area of 560000 square meters and a project investment of nearly 3 billion yuan.

This project adopts our company's cylindrical formwork integrated pouring construction, and does not require the use of cranes. Manual installation of the formwork can be completed. For the same engineering quality, if steel circular formwork is used for construction, the installation and construction period using a crane will take at least 15 days, and the procurement cost alone will reach 1.6 million yuan (this price has already deducted the cost of recycling waste formwork).

Especially with the additional 10 day construction period, it brings additional costs such as equipment rental and office staff expenses to the construction party, which are estimated to be between 600000 and 1 million. In this way, using our company's wooden circular formwork can save more than 1.9 million yuan in costs and greatly shorten the construction period. If PVC round formwork and strip formwork are used, the price will be higher, and the construction period cannot be guaranteed.

Characteristic

Customer Review

This project uses cylindrical wooden formwork produced by our company, which greatly shortens the formwork support cycle. After the formwork is removed, the column formwork is formed with clean water, saving construction costs and gaining high recognition from the construction unit.

Recommended Cases